PIECE PART MANUFACTURING CASE STUDY
Improve Product Quality / Improve Worker Safety
Piece Part Manufacturing - Tube Bending
TW Automation designed and installed this industry award winning quad FANUC robot machine tending automation cell used for tube bending in a 1+ million square foot facility.
TW Automation’s robotic solution helped this manufacturer significantly increase daily production output, reduce their labor costs, improve piece part quality and provided a robotic automation system capable of operating three (3) shifts per day with minimal operator control and support.
Discover how TW Automation can design and install your robotic solution. Contact us today to talk about the future of your company: 913-303-9700
Goals Of Automation
The goal for each of the new systems was to eliminate the manual labor required for a highly repetitive process, increase production volumes and provide a boost in overall production control. Key component suppliers included FANUC, Allen-Bradley, Keyence and Sick.

Contact TW Automation (913) 303-9700 for new robotic integrations, as well as repair and maintenance, updates and upgrades, and even training!
GET A FREE ESTIMATE TODAY!
IN NEED OF TECHNICAL SUPPORT?
Made in America
US manufacturing continues to gain strength, but there is no rising tide to lift every boat. Defending what you’ve got while seizing new opportunities requires escalating levels of manufacturing efficiency and flexibility. That’s where we come in. TW Automation builds robotic solutions for managing and growing your business. We’ve been delivering turn-key robotic solutions, along with a full range of technical and support services, since 1996.
Automation Solutions & Benefits
The four FANUC robots were integrated with a custom tube seam finding station designed by TW Automation, two new BLM tube benders, two customer furnished tube flattening presses, two TW Automation custom designed inspection stations and four “hot swap” material handling cart stations designed by TW Automation.
Each cart has 100 storage locations and material handlers can move carts in & out of the cell without stopping the robots during production. The inspection stations can measure up to 21 conformance characteristics for each completed tube. The cell has the capacity to produce and rack two (2) completed formed tubes every 24 seconds. Calculated ROI payback = 16 months.
TW Automation has successfully implemented solutions for industries across the board over the last 20 years. To learn how we can help you contact us today: 913-303-9700

WE OFFER A FULL LINE OF TECHNICAL SUPPORT & SERVICES
On-demand and annual service agreements allow you to manage your operations and budget with confidence.
WHAT OUR CUSTOMERS SAY
TURN KEY AUTOMATION SOLUTIONS
RECENT AUTOMATION TOPICS

Robotic Palletizing Systems: Are They Right for Your Operation?
If your facility still relies on manual stacking or outdated equipment, you may be missing out on significant productivity gains.

What to Expect for Robotics in 2026: Key Trends Shaping Manufacturing
The manufacturing world is changing fast. By 2026, robotics will encompass more than just automation. It will be about intelligent,

Can I Afford Robots and Automation?
In the modern business landscape, robots and automation have become synonymous with increased efficiency, precision, and reduced operational costs. The





